Sif Group, representing KCI the engineers, GE Renewable Energy, and Pondera have signed a Memorandum of Understanding (MoU) for the feasibility study of ...
Phase one would involve a concept study in which project teams of KCI, Sif, Pondera, and GE Renewable Energy carry out a feasibility study of offshore, off-grid centralized green hydrogen production. The demonstrator is planned for operational use and testing by 2023. The AmpHytrite project is aimed at mastering the complexity of a centralized offshore and off-grid hydrogen production unit and is aiming for a staged construction and operation of this green hydrogen offshore wind production unit.
The Green Hydrogen Centralized Offshore Wind Production Project, or AmpHytrite, is aimed at “mastering the complexity” of a centralised offshore and off-grid ...
The objective of this phase would be to develop and construct a smaller version of the main phase as proof of concept, taking on the full complexity of offshore and off-grid operation, whilst being installed onshore at the Sif terminal. The project scope, which is designed to simulate the complexity of having a centralised green hydrogen unit operating offshore and off-grid, would address the end-to-end process of producing green electrons by an offshore wind turbine – Haliade-X – through to the offtake profile for the onshore hydrogen customer. The Green Hydrogen Centralized Offshore Wind Production Project, or AmpHytrite, is aimed at “mastering the complexity” of a centralised offshore and off-grid hydrogen production unit.